Skip to content
Cora Systems Logo

Video

Real-Time Earned Value Management: How Cora Unifies Cost and Schedule Data in One Platform

May 26, 2026

  • linkedin
  • twitter
  • facebook
  • share-icon

Cora's Cost Schedule and EVM integration eliminates the painful cycle of imports, exports, and reconciliation across disconnected tools. Cost, schedule, and earned value data are fused into a single platform — updated in one click, fully auditable, and available in hours, not days.

One Platform. Real-Time Cost, Schedule & Earned Value — Fully Integrated.

Cora GovCon

Key EVM Capabilities

Integrated Cost and Schedule

The first solution to fully unify cost and schedule data in one platform, in real-time, without imports, exports, or delays. Provides program and control account managers with a powerful workbench offering a single, real-time view of budgets, forecasts, and Estimates at Completion (EACs).

Comprehensive Earned Value Techniques

Comprehensive Earned Value Techniques (EVTs) supports an expansive range of EVT methodologies, aligning with industry standards and DoD EVMS Interpretation Guide requirements. Defines how task progress is calculated and reflected in Earned Value Percent Complete (EV%) and Budgeted Cost of Work Performed (BCWP).

Dynamic EV Period Data & EAC Analysis

Dynamic EV Period Data & EAC Analysis collects monthly cost and schedule information at Control Account and Work Package levels, including actuals, budgets, planned values, and performance metrics. Features a flexible EAC Analysis grid for filtering, sorting, and sharing performance data to enhance analysis and simplify government contract reporting.

Rigorous Baseline Change Control

Rigorous Baseline Change Control (BCC) maintains Performance Measurement Baseline (PMB) integrity by documenting, authorizing, and integrating all changes with complete traceability. Allows modeling and assessment of project changes before implementation, with XML export format for easier EVMS compliance.

Insightful Variance Reporting

Insightful Variance Reporting identifies and analyzes Schedule Variances (SVs), Cost Variances (CVs), and Variance at Completion (VAC) with configurable thresholds. Captures the "why, what, how, when, and who" for any variance, with automatic tests when EV Period Data is generated.

Cora project analytics icon showing three bar graph columns with a magnifying glass in front of them. The icon is a purple to pink gradient.

DCMA 14-Point Health Check

The system enables program managers to run the DCMA 14-point schedule health check directly against the Gantt schedule. Results are automatically logged in a dedicated DCMA audit page within Cora, ensuring compliance with schedule integrity standards and improving project reliability and reporting accuracy.

See Why leaders in Manufacturing, Life Sciences, Energy, Aerospace & Defense, and More Choose Cora PPM

Transform Program Delivery with Cora GovCon

$450m

Improvement to bottom line


Red "Honeywell" logo on a transparent background.

10%

Reduction in operational execution costs


$200m

Reduction in cost overruns


Red "Honeywell" logo on a transparent background.

2%

Increase in net profit on projects


Red and black "Tech Logic" logo with a curved red swoosh above the "T".

$3.5bn

Portfolios consolidated in a single platform


$2.5m

Increase in planned savings annually


Blue Teleflex logo with stylized "T" and "F" design elements and registered trademark symbol.

Related Insights